Bridges, roads, railways and ports. Infrastructure BIM differs from building BIM in both software and workflows.

BIM coordination for infrastructure
Infrastructure BIM on site
Infrastructure BIM

How does infrastructure BIM differ from BIM coordination for buildings?

Infrastructure BIM covers elements such as bridges, roads, railways and ports. The work is always done in global coordinates, using the Estonian L-EST coordinate system and the EH2000 height system. Surface models and alignments are exchanged in the open LandXML format.

Machine control models have been used in infrastructure for more than ten years, especially in cities, where excavators and bulldozers work from the models. Even so, using models on site is still limited to a small circle of specialists, and site management teams often lack the ability to view them.

L-ESTEH2000LandXMLIFC4x3
Background

About infrastructure BIM

IFC in infrastructure

IFC is less common in infrastructure because the models are simpler in nature. With recent versions such as IFC4x3, however, IFC has become more accepted, as it supports alignments and surfaces.

Software

Civil 3D and Quadri are the main tools used to create the models. Trimble Connect and Infrakit are key tools for using the models and alignments.

Point clouds

Point clouds captured with drones, laser scanners and vehicle-mounted scanners are valuable data collection tools. They are still a challenge for coordinators and surveyors, because they have to be managed so that every party can view and use them. The most common open formats are .e57, .las, .laz and XYZ.

Infrastructure BIM brings geospatial information and engineering together!
Experience

Our projects

Selja ökodukt

Selja Ecoduct

Service:
BIM infra
Clients:
TREF Nord AS
We supported the construction and design teams in various BIM-related topics and implementation processes. We assisted in understanding and fulfilling the Rail Baltica (RB) requirements, ensuring that the project data structure complied with standards and was properly built.
Duration:
Jaanuar 2023 - Detsember 2024
RB Ülemiste terminali 1. etapp

RB Ülemiste Terminal – Stage 1

Service:
BIM infra
Clients:
Merko Ehitus Eesti AS
BIM coordination and as-built model creation, providing consulting to all project stakeholders and support for BIM-related software.
Duration:
Märts 2023 - töös
Lastekodu tn ja Masina tn (Lastekodu tn – Tartu mnt) rekonstrueerimine

Reconstruction of Lastekodu Street and Masina Street (Lastekodu St – Tartu Rd)

Service:
As-built model
Clients:
TREF Nord AS
BIM koordineerimine ja teostusmudeli loomine. Jooksev BIM tugi.
Duration:
Juuni 2024 – töös
Põrguvälja viadukt

Põrguvälja viaduct

Service:
BIM infra
Clients:
Verston OÜ
BIM coordination and creation of the as-built model, BIM consulting for various stakeholders, and software support.
Duration:
Juuni 2023 – Detsember 2024
Lepplaane ja Kivisilla rajatiste ehitus

Construction of Lepplaane and Kivisilla Structures

Service:
BIM infra
Clients:
TREF Nord AS
BIM coordination of the construction and as-built model, along with ongoing BIM support and consultation for project stakeholders.
Duration:
Juuni 2023 – in progress
Loone-Künka tarcon.ee

Rail Baltica Loone ecoduct and Künka road viaduct

Service:
As-built model
Clients:
YIT Eesti AS, Rail Baltic Estonia OÜ
BIM coordination and creation of an as-built model during the construction of civil engineering works. An exciting and novel challenge from which all parties learned.
Duration:
Oktoober 2021 – Detsember 2022