BIM coordination for buildings
Our role is to be the right hand of the design and construction project manager on the model and on digitalisation more broadly.
What is BIM coordination?
From setting up the project data environment, building the federated model and guiding the project parties, to clash detection and producing information tables from the model. Working with us, the client also gets change management for the team and the “people side” of the work as a bonus.
BIM coordination can start as early as the concept stage and continue through preliminary, permit and technical design all the way to the as-built model.
What the coordinator does
Building federated models
We combine the models of all parties into one federated model that gives a complete overview of the whole project.
Checking the data
We check the information in the models to make sure it is correct in both format and content. The value of a model lies not only in its geometry but also in the data it contains.
Clash detection
We run geometric clash detection between the discipline models. This shows, for example, how the heating and ventilation systems fit together in the building, and helps avoid conflicts.
Producing quantity tables
We produce detailed information tables with the key data on materials, quantities and other details that matter to the project.
Benefits of BIM coordination
With us, model-based design is not just about meeting a government requirement. We make the model really work for you.
- ✓Fewer design errors. Effective coordination helps prevent and reduce design and construction errors, which saves time and money.
- ✓Smoother, clearer communication. BIM lets every party view the same model in real time and comment on the work done.
- ✓Accurate construction quantities. The model lets you forecast material use and the schedule, which helps avoid cost overruns and delays.
Where BIM theory says “it can't be done”, we make a habit of finding a way.
What our clients say
Margot Sirelpuu
Ehitustrust
BIM coordinator
“Tarcon's great team has helped us enrich models with information on several projects. When the designs have been incomplete, they have also helped coordinate the information using various software such as BIMcollab. Tarcon also runs IFC training, which is a cornerstone of model-based information exchange, and so gives project parties a fishing rod instead of a fish. Thoroughly capable people when you need help with BIM coordination.”
Erik Lillepalu
Sweco EST OÜ
Head of the Building Design Department
“Many thanks to the TARCON team. Consistent, persistent work with the contractor has paid off and the as-built model turned out very well. The contractors seemed well motivated by Tarcon showing the percentage completion of as-built information for each work package at site meetings. Nobody wanted to be the one holding things up, and so things got done. The bar can always be raised, but this is the best as-built model to RKAS requirements that I have seen so far.”
Our projects
BIM coordination for the design and construction of Lembitu Street 4 hotel
DHL cargo terminal BIM coordination and as-built model development.
Reconstruction of the National Library of Estonia
Reconstruction of the Estonian Knighthood House
Pärnu State House (Roheline 64)
Valga State House
Merivälja road 33 office building
Laki 11 office and warehouse building
Staadioni 81/83