BIM coordination for infrastructure
Bridges, roads, railways and ports. Infrastructure BIM differs from building BIM in both software and workflows.
How does infrastructure BIM differ from BIM coordination for buildings?
Infrastructure BIM covers elements such as bridges, roads, railways and ports. The work is always done in global coordinates, using the Estonian L-EST coordinate system and the EH2000 height system. Surface models and alignments are exchanged in the open LandXML format.
Machine control models have been used in infrastructure for more than ten years, especially in cities, where excavators and bulldozers work from the models. Even so, using models on site is still limited to a small circle of specialists, and site management teams often lack the ability to view them.
About infrastructure BIM
IFC in infrastructure
IFC is less common in infrastructure because the models are simpler in nature. With recent versions such as IFC4x3, however, IFC has become more accepted, as it supports alignments and surfaces.
Software
Civil 3D and Quadri are the main tools used to create the models. Trimble Connect and Infrakit are key tools for using the models and alignments.
Point clouds
Point clouds captured with drones, laser scanners and vehicle-mounted scanners are valuable data collection tools. They are still a challenge for coordinators and surveyors, because they have to be managed so that every party can view and use them. The most common open formats are .e57, .las, .laz and XYZ.
Infrastructure BIM brings geospatial information and engineering together!
Our projects
Selja Ecoduct
RB Ülemiste Terminal – Stage 1
Reconstruction of Lastekodu Street and Masina Street (Lastekodu St – Tartu Rd)
Põrguvälja viaduct
Construction of Lepplaane and Kivisilla Structures
Rail Baltica Loone ecoduct and Künka road viaduct
Want to know more?
Tell us about your infrastructure project and we will work out together how to make the model work for you.
Contact us