Paide State House reconstruction
We coordinated the as-built model of the Paide State House and captured the building with 360° photos.

We coordinated the as-built model of the Paide State House and captured the building with 360° photos.

We coordinated the technical design and the as-built model of the Rapla State House.

We produced the as-built model of the Kuressaare Courthouse from as-built drawings and 360° photos.

We coordinated the as-built model of the METK breeding centre 2, using 360° photos.

We acted as BIM coordinator during construction and produced the as-built model of the kindergarten.

We coordinated the as-built model of the kindergarten and drew up the BIM execution plan for construction.

We coordinated the as-built model of the kindergarten and set up the federated model.

We coordinated the as-built model of the kindergarten and drew up the BIM execution plan for construction.

We coordinated the as-built model of the kindergarten in line with the Estonian Common BIM Requirements (ÜBN).

We coordinated the models for the restoration of the Patarei building wing and the as-built model.

We coordinate the design of phase III of the Hipodroom apartment buildings from preliminary to technical design.

We coordinate the design of the Jõekääru apartment buildings across several phases.

We acted as BIM coordinator during the design of the building complex.

We coordinated the design of the TalTech U03 building.

We acted as BIM coordinator during both design and construction.

We coordinated the high-rise models and advised the design team.

We coordinated the design of the support centre.

We coordinated the design of the apartment buildings.

We are coordinating the design of the hotel reconstruction. Work in progress.

We coordinated the hotel models during construction.

Software support. A helping hand for the site and design teams on BIM topics and implementation.

BIM coordination and as-built model. BIM consulting for all parties. Software support.

BIM coordination, ongoing BIM consulting and support.

BIM coordination of a new development, ongoing BIM consulting and support.

BIM coordination of a new building at preliminary design stage.

BIM coordination of the reconstruction technical design and production of the as-built model.

BIM coordination of the reconstruction technical design and production of the as-built model.

BIM coordination of the reconstruction technical design, Dalux workflow setup, ongoing consulting and BIM support.

BIM coordination of the external works during construction and production of the as-built model. Day-to-day support for the contractor.

BIM coordination, followed by room data sheets and an as-built model meeting the RKAS requirements.

BIM coordination of a new building at concept and technical design stage.

BIM coordination of the technical design for a new building and production of the as-built model.

BIM coordination of a new building at concept and preliminary design stage.

The reconstruction of a historic building, carried out by true professionals in their field. We provided BIM coordination and produced the as-built model.

We produced the as-built model of the new Merivälja kindergarten in Tallinn. Along the way, the main contractor's construction team became much more confident with BIM.

A very pleasant collaboration with the main contractor. Good human communication is what takes the brakes off innovation.

BIM coordination of the preliminary and permit design for a new development, with ongoing BIM consulting and support.

BIM coordination of the preliminary and permit design for a new development, with ongoing BIM consulting and support.

BIM coordination of the preliminary and permit design for the Staadioni 83 reconstruction and the Staadioni 81 new development, with ongoing BIM consulting and support.

BIM coordination of the technical design, Dalux setup for the site team, ongoing BIM consulting and support, and finally a correct BIM as-built model.

BIM coordination of the reconstruction technical design and production of the as-built model.

BIM coordination of the reconstruction technical design and production of the as-built model.

The reconstruction of a large and complex historic building, using BIM models, point clouds and smooth model-based communication.

BIM coordination, ongoing consulting and BIM support.

BIM coordination of the reconstruction technical design and production of the as-built model. Dalux training, setup and management.

BIM coordination of the technical design for a new building and production of the as-built model.

We acted as BIM coordinator during construction of the viaduct and the bridge.

We coordinated the design of the viaduct and the as-built model.

We coordinated the road viaduct models during construction.

We coordinated the wildlife crossing models during construction.

We coordinated the street reconstruction models from design through to construction.

We coordinated the models for the street lighting construction.

We coordinated the street lighting design.

We produced quantity and data tables from the Rail Baltica models.

BIM coordination and as-built model. Ongoing BIM support.

We supported the site and design teams on BIM topics and implementation. We helped them understand and follow the structure of the Rail Baltica requirements, so the project data met the standards and was set up correctly.

BIM coordination of construction and the as-built model, with ongoing BIM support and consulting for the project parties.

BIM coordination and as-built model. BIM consulting for all parties. Software support.

BIM coordination and as-built model. BIM consulting for all parties. Software support.

BIM coordination of the structures during construction and production of the as-built model. A new and exciting challenge that every party learned from.

We audited the BIM models of the cultural centre.

We checked the BIM models of the building.

We audited the Pargimaja models and carried out a follow-up check.

We audited the models of the extension.

We audited the models of the circular economy building.

We audited the models produced in the technical design and gave feedback on information content and geometry.

We took part in drafting version 4.0 of the Estonian Common BIM Requirements (ÜBN).

We ran a quantity take-off workshop for YIT's cost estimators.

We took areas and quantities out of the model room by room.

We advised on BIM-based building permit procedures.

We built a Simplebim-based solution for processing IFC files automatically.

We advised on how to adapt models for facility management with Simplebim.

We took quantities out of the models for a life cycle assessment (LCA).

We took quantities out of the models for a life cycle assessment (LCA).

Silman wanted to start using Revit for lighting design. We ran an introductory course focused on adopting the software with the right working methods and proper templates, covering families, parameters and the specifics of lighting projects in Revit.

Together with TTK University of Applied Sciences and TalTech, we helped run a BIM pilot course for construction managers. The aim was to test a new course format for future student programmes. We also gave a lecture at TalTech on using Simplebim to manage BIM data.

Archicad, widely used by architects, needs skilful handling to produce an IFC that works for quantity take-off. We taught the design team led by YIT Eesti how to do it.

MagiCAD for AutoCAD, widely used by building services designers, needs skilful handling to produce a clean IFC. We taught the Norte team how to do it.

We trained the team to use IFC models with BIMcollab.

We trained the Siuru project team to use IFC models with BIMcollab.

We trained the project team before the project started.

We trained the team to use Dalux.

We trained the cost estimating team to use IFC models.

After the training, we embedded the use of Simplebim with follow-up sessions.

We trained the team to use BIMcollab and Simplebim.

We ran hands-on Simplebim workshops for construction companies.

We trained teams to use BIM models.

The course focused on BIMcollab ZOOM. We showed what the free model viewer can do, covered the basics and went into depth on its more powerful tools.

We focused on the specifics of IFC files and on using BIMcollab Lists in practice to analyse model quantities.

We introduced BIMcollab and model-based communication, and explained the Rail Baltica documentation requirements.

Estonia's largest construction company hired a room at TalTech and trusted us to train its team in BIM, twice in a row.

Training the same team a second time had a stronger effect, and the questions were highly professional and moved the work forward.

We linked the construction schedule to the model as a 4D schedule.

We produced an analysis based on a point cloud.

We analysed the crane lifting schedule using the model.

We modelled the external works and coordinated their models.

We set up the projects in Dalux.

We produced room data sheets for the school.

We built a crane model to check whether the crane position suits the element lifts. The model compared lifting capacity with element weights, and the results were shown as a colour code to reveal overload risks.

We built a crane model to check whether the crane position suits the element lifts. The model compared lifting capacity with element weights, and the results were shown as a colour code to reveal overload risks.

We set up Dalux FM for the Radisson hotel. We added room elements from 2D drawings and imported equipment, classification, checklists and other data, so the maintenance team could start using the platform straight away.

From the client's drawings and input, we built a detailed 3D model of the recreation area and produced photorealistic renders of the final result.

We built an architectural 3D model from 2D drawings, prepared to meet the requirements of IDA ICE so the building's energy performance and indoor climate could be analysed.

From the client's models, we produced room data sheets for the Tartu Courthouse showing the elements and finishes in each room. Each sheet shows the products used in the room and where they are.

From the client's 2D drawings, we built a 3D model of the gas supply in Revit. The model follows the existing drawings exactly and gives a clear, coordinated view of the system.

Visualisations made to the client's wishes.

We modelled earthworks quantities from the design data, a point cloud and survey input, exported the result to IFC and showed it together with the design model. This gave the contractor the overview it needed.

A visualisation of a private house made from 2D drawings at the client's request. The family could see that their future home matched their wishes.